PT Enerco RPO lnternasional intends to build a new TDAE (Treated Distillate Aromatic Extract) Processing Plant located inside Kabil Industrial Estate, Batam Island, Indonesia. The purpose of the TDAE Plant is to process Distillate Aromatics Extract (DAE) with the design feed capacity of 213 KTPA. The Plant consist of Extraction Unit and Purification Unit and Separation Unit (ISBL area), Steam Boiler Generation, Cooling Tower Package, Tank Farm facilities, Control Room Building, Sub Station and Utility facilities (OSBL), Marine Loading Arms and Pipeline to jetty 4 around 1.3 km.

This new TDAE Processing Plant project is desirable to complete under provision of PCI (Procurement for Bulk Material, Construction and Installation) contract, including fabrication, transportation, rigging and mechanical completion (ready for commissioning) and assistance commissioning.

caption gambar sumber

Scope of works

  • Pipe spool fabrication
  • Blasting and Painting work
  • Pipe Installation complete with pipe support
  • Pipe NOE inspection, hydrotest and leak test
  • Steam tracing fabrication and installation
  • Pipe Insulation
  • Installation in-line valve, Strainer and instrumentation
  • Install all pipe insulation item
  • Chemical cleaning for Stainless Steel Pipe Material
  • Bolt Tensioning
  • Pipe Mechanical Completion (Pipe flushing/Cleaning, Air Blowing, Nitrogen